Method of project management based on Story Points estimations

Authors

DOI:

https://doi.org/10.18372/2073-4751.77.18664

Keywords:

project management, network scheduling, tasks execution scheduling, Story Points, optimization of execution time, optimization of the employees number

Abstract

The paper is devoted to the development of building project management systems methods that allows to perform automatic project scheduling, where tasks are estimated in story points. The paper reviewed the existing systems and proposed an approach to the automation of project scheduling in minimum time, and using the minimum employees number who will complete the project in the given time.

The proposed approach allows taking into account the velocity, specialization and salaries of employees. Taking into account these features, and using of the tasks complexity in story points, brings scheduling closer to reality, which allows to increase the accuracy of scheduling, reduce the time of project execution and/or costs for employees and the project in general.

References

Devisdon D. Why do we use Story Points for Estimating? URL: https://www.scrum.org/resources/blog/why-do-we-use-story-points-estimating.

Русанова О. В., Корочкін О. В., Медведкова Ю. І. Спосіб управління проєктами на основі мережевого планування. Проблеми інформатизації та управління. 2022. №3(71). С. 51–56.

Єгорченков О. В., Єгорченкова Н. Ю., Катаєва Є. Ю. Азбука управління проектами. Планування : навч. посіб. Київ : КНУ ім.Т.Шевченка, 2017. 117 с.

Published

2024-04-01

Issue

Section

Статті