METHOD OF LOSS IDENTIFICATION IN BROADCAST SOFTWARE DEVELOPMENT
Keywords:
Sustainable development, software, resourceful software development, loss.Abstract
Often there is a situation where the developer has several active projects. For example, the desire of the staff in all phases of agile development is the fact that the same people will be involved in several projects. Then, the way of organizing works, can be both designs of switching between them. The method of identification of wastes in broadcast software development is proposed. The method is based on the hypothetical-deductive model of scientific method and therefore has two main components. First, the hypotheses regarding wastes in lean software development. Second, an experiment to verify the hypothesis. In experiments is performed identification of wastes. Application of the method is considered for example on switching of problems. Types of activities leading to wastes and types of wastes is presented. The method can be applied not only to study the wastes of movement (which include consider switching between tasks), but also to other types of wastes.References
Сидоров Н.А. Экология программного обеспечения/ Н.А. Сидоров/. – Інжененрія програмного забезпечення . – № 1. – 2010. – С. 53 – 61.
Попендик М. Бережливое производство программного обеспечения/ Попендик Т. – М.: Вильямс, 2010. – 256 с.
Сидоров Є.М. Класифікація відходів для розробки програмного забезпечення. / Сидоров Є.М.// Вісник Східноукраїнського національного університету імені В. Даля. – №3. – 2013. – С.20 – 23.
Monsell S. Task switching. TRENDS in Gognitive Sciences/ S.Monsell /. – V.7. – N.3. – 2003. – P.134 – 140.
Bondarenko O. Task switching in Detail: Task Identification, Switching Strategies and Influencing Factors/ O.Bondarenko /. – Eindhoven Univ.of Techn. – 2004. – 11p.
Czerwinski M. A Diary Study of Task Switching and Interruptions. – Microsoft Research /E.Horvitz, S.Wilhite /. – 2001. – 12p.
Muller M.J. Activity Graphs of the Microstructure of Complex Work. IBM Research /M.J. Muller/. – 2004. – 3p.
Mark G. The Cost of Interrupted Work: More Speed and Stress/ D.Gudith., U.Klocke // Universiti of California. – 2005. – 5p.