Modelling of the sequence of the technological process fulfillment in building construction
DOI:
https://doi.org/10.18372/2306-1472.18.15417Abstract
The tools for modelling of the sequence of the technological process fulfillment in building construction is developed with account on possibilities of compromising decisions and simultaneous decreasing of construction duration and cost, number of workers, increasing of productivity of the work.References
Hejducki Z., Mrozowisz J. Stream methods of construction work organization: an introduction to the problem // Engineering, Construction an Architectural Management. - 2001. - Vol. 8, № 2. - P. 80-89.
Hejducki Z. Scheduling model of construction activity with time couplings // Journal of Civil Engineering and Management. - 2003. - Vol. 9, № 4. - P.284-291.
Афанасьев В. А. Поточная организация строительства. -Л.: Стройиздат, 1990.
Пелдшус Ф., Завадскас Э. К. Матричные игры в технологии и управлении строительством. - Вильнюс: Техника, 1997 (на лит. яз.).
Завадскас Э. К. Комплексная оценка и выбор ресурсосберегающих решений в строительстве. - Вильнюс: Мокслас, 1987.
Hwang C. L., Yoon К. Multiple attribute decision making. Methods and Applications. Springer-Verlag. - Berlin. Heidelberg. New York, 1981.
LEVI-3.0 Multiple criteria evaluation program for construction solution / E.K. Zavadskas, L. Usti- novicius, Z. Turskis, F. a.o.// Journal of Civil Engi-neering and Management. - 2002. - Vol. 8, № 3 - P. 184-191.
Zavadskas E. K., Ustinovicius L., Peldschus F. Development of software for multiple criteria evaluation // Informatica. - 2003 - Vol. 14, №.2. - P. 259-272.