[1]
Suprun, D. 2023. IMPLEMENTATION OF PROJECT ACTIVITIES AS THE PRIORITY OF PROVIDING CONTINUING EDUCATION . Actual Problems in the System of Education: General Secondary Education Institution – Pre-University Training – Higher Education Institution. 1, 3 (Jul. 2023), 33–38. DOI:https://doi.org/10.18372/2786-5487.1.17679.